Energy Analysis of Lighting
posted 7:53 PM Monday, September 29, 2008 by sgunter2
A general lighting layout (as well as the corresponding bulb types) has been established for the house. Accent lighting and the exact placement of fixtures will be determined after meeting with the architecture group.
On first glance, with the gabled roof and ceiling, PAR or reflector light bulbs may be the preferred type versus the general type which will shed excess light towards the ceiling and uninhabited space.
A comparison was made between incandescent, CFL, and LED light bulbs of similar lumen output and bulb shape. The analysis included the cost of electricity for using each type of bulb as well as the cost of replacing bulbs within a 50,000 to 60,000 hour time period. The results and additional comments are included in the Wiki.
The results do not consider dimming options since LEDs are not easily adjusted by dimming switches. Further investigation will be required if this is deemed necessary.
Comments
Archive
- 2009 (39)
- 2008 (68)
- December (11)
- November (5)
- October (21)
- September (27)
- Updating DC Balance of Plant (Sep 30)
- Solar Panel Update (Sep 30)
- Energy Analysis of Lighting (Sep 29)
- Uncategorized (Sep 29)
- Tankless Water Heating Update (Sep 24)
- Quick Panel Racking update (Sep 22)
- Optiwin Windows (Sep 17)
- Shading Price Evaluations (Sep 17)
- Solar thermal hot water system: evacuated tube collectors (Sep 17)
- Tankless water heating evaluation (Sep 17)
- DC Electrical Balance of Plant (Sep 16)
- Insulation (Sep 16)
- Solar Panels (Sep 16)
- Panel Racking & Safety (Sep 16)
- Inverters & Monitors Quality vs. Affordability / Our Recommendation (Sep 15)
- Lighting Estimates (Sep 15)
- Inverters & Monitors (Sep 11)
- Windows (Sep 10)
- Shading (Blinds, Curtains, Awnings, etc.) (Sep 10)
- Tankless Water Heaters (Sep 9)
- Inuslation (Sep 9)
- Resource and Control Systems (Sep 9)
- Solar hot water systems and the SRCC (Sep 9)
- Commercial Solar Panel Research (Sep 9)
- First look at Solar Panel Racking (Sep 9)
- Light Bulb Evaluations (Sep 8)
- Tradeoffs in Balance of System Materials (Sep 3)
- August (2)
- June (1)
- February (1)